A slope calculator is an essential tool for architects, engineers, contractors, and site planners. It converts between the five common ways slope is expressed: rise over run (1:20), percentage grade (5%), angle in degrees (2.86°), pitch (X:12), and ratio. Rather than manually converting between these formats — which is error-prone under field conditions — a slope calculator handles all conversions instantly from any two known values.
Slope Slider is designed specifically for architectural and civil engineering workflows. Enter any two of rise, run, or slope and the third calculates automatically. Switch between decimal feet, feet-inches (4'6"), and metric at any time. The built-in slope slider lets you explore grade ranges interactively and snap to key ADA threshold values.
Slope is calculated by dividing the vertical rise by the horizontal run. The result can be expressed as a percentage (rise/run × 100), a ratio (1:N where N = run/rise), a pitch (rise per 12 units of run), or an angle in degrees (arctan of rise/run).
For example, a ramp with 1 foot of rise over 20 feet of run has a slope of 5% (1:20), a pitch of 0.6:12, and an angle of 2.86°. This is the maximum slope for an accessible route that does not require ramp handrails or edge protection under ADA guidelines.
The Americans with Disabilities Act (ADA) establishes specific slope limits for accessible design. These thresholds are critical for architects and contractors working on any federally regulated project:
Cross slopes — the slope perpendicular to the direction of travel — must not exceed 2.08% (1:48) on any accessible route, including sidewalks, ramps, and parking areas.
The International Building Code governs ramp design for most commercial and institutional projects in the United States. Key IBC ramp requirements include:
IBC ramp requirements align closely with ADA standards, though the IBC applies to building construction while ADA governs accessibility for persons with disabilities. Both must be satisfied on most projects.
California's Building Code (CBC Title 24) is more stringent than federal ADA in several areas. For ramp design, CBC 11B-405 prefers a maximum slope of 1:16 (6.25%) for new construction where feasible, compared to the federal ADA maximum of 1:12 (8.33%). The CBC also requires:
California projects should be verified against both CBC Title 24 and the federal ADA Standards for Accessible Design. When requirements conflict, the more restrictive standard applies.
What is the maximum slope for an ADA ramp?
The ADA maximum ramp slope is 1:12, which equals 8.33% or 4.76°. This applies to ramps serving as part of an accessible route in new construction. Existing buildings undergoing alterations may use slopes up to 1:8 (12.5%) where space is severely limited, but this is not permitted in new construction.
What slope is required for accessible parking?
ADA §502.4 requires that accessible parking spaces and access aisles have a maximum slope of 2% (1:50) in any direction. This applies to both the parking space itself and the adjacent access aisle.
What is the difference between slope percentage and pitch?
Slope percentage expresses rise as a fraction of run multiplied by 100 (e.g. 5%). Pitch expresses the same relationship as rise per 12 units of run (e.g. 0.6:12). Pitch is commonly used in roofing while percentage grade is used in site design and ADA compliance.
How steep can a driveway be?
Most jurisdictions allow residential driveways up to 15–20% slope, though this varies significantly by local code. Driveways steeper than 15% can be challenging for low-clearance vehicles and may require review by the local AHJ. Honolulu DPP, for example, has specific driveway grade requirements that must be verified for each project.
How do I convert slope percentage to degrees?
Use the arctangent function: Angle (°) = arctan(slope% ÷ 100) × (180 ÷ π). For example, 8.33% slope = arctan(0.0833) × 57.296 = 4.76°. Slope Slider calculates this automatically alongside all other slope representations.
What does 1:20 slope mean?
A 1:20 slope means 1 unit of rise for every 20 units of run — equivalent to 5% grade or 2.86°. This is the ADA threshold for accessible routes: slopes at or below 1:20 do not require ramp construction, handrails, or edge protection.
⚠ Reference only — always verify slope requirements with your local Authority Having Jurisdiction (AHJ), ADA coordinator, and applicable building codes. Requirements vary by project type, occupancy, jurisdiction, and date of construction.